Production Line

1. The chassis is online
1.1 Fix the chassis

1.2 Put the foot pad
1.3 Install the chassis heating belt
1.4 Install the liquid reservoir


2. Install the compressor


3. Install the evaporator


4. Install condenser and plate heat exchanger

5. Pipeline connection

6. Leak detection: fill with nitrogen and detect leaks.


7. Pack insulation pipe and compressor silencer cotton.


8. Install the motor

9. Install fan blades, brackets, and reactors


10. Intubation warm wire

11. Wiring and management

12. Install fuselage parts

13. Vacuumizing and charging refrigerant

14. Safety inspection

15. Performance testing

16. Install fuselage components

17. Paste the panel label

18. Accessories

19. Packing